Case CX210C (21 tonne)
In the yard21 tonnes. Comes with 3 Buckets and Tilt Hitch. Transport Required.
- Digging Depth
- approx. 6.6 metres
Excavators for site prep, trenching, bulk earthworks and tight-access work, hired out of our Sale yard. Wet or dry hire, delivered to your site across Gippsland.

21 tonnes. Comes with 3 Buckets and Tilt Hitch. Transport Required.
14.5 tonnes. Comes with 3 Buckets and 180 degree Tilt Hitch. Top Con Wired. Transport Required.
10 tonnes. Comes with 3 Buckets and 180 degree Tilt Hitch. Transport Required.
6 tonnes. Comes with 4 Buckets and Standard Hitch. Transport Required.
3.5 tonnes. Comes with 4 Buckets and Standard Hitch. Transport Required.
1.8 tonnes. Comes with 4 Buckets and 180 degree Tilt Hitch. Comes Standard with Plant Trailer.
1.2 tonnes. Comes with 4 Buckets and Standard Hitch. Comes Standard with Plant Trailer.
2.6 tonnes. Comes with 3 Buckets and Standard Hitch. Comes Standard with Plant Trailer.
If it isn't here, call the yard and ask.